DOCUMENT MPC Annual Interregional Coordination Meeting 2025 Jan. 27, 2025, 7:38 a.m. High-level details for the 2025 AICM hosted by CAISO 2025_Interregional_Coordination_Meeti… (.pdf)
DOCUMENT MPC Approved 2024 Economic Study Request, North Plains Connector FERC 1000 2024-25 Jan. 23, 2025, 9:10 a.m. Approved 2024 ESR Report for the North Plains Connector Project ESR_NorthPlains_Approved_REport.pdf (.pdf)
DOCUMENT MPC Approved 2024-2025 Study Scope FERC 1000 2024-25 Jan. 23, 2025, 8:34 a.m. Approved 2024-2025 Study Scope 2024_2025_Approved_Study_Scope.pdf (.pdf)
Jan 21 EVENT MPC NorthernGrid Jan 2025 Member Planning Committee Meeting Jan. 21, 2025, 11 a.m. This meeting is conducted under standard business practices and procedures.
DOCUMENT MPC Draft ESR for Consideration, 2024 North Plains Connector FERC 1000 2024-25 Jan. 6, 2025, 1:23 p.m. ESR_NorthPlains_Draft_Report.pdf (.pdf)
Dec 18 EVENT MPC NorthernGrid MPC Dec. 18, 2024, 1 p.m. This meeting is conducted under standard business practices and procedures.
DOCUMENT MPC Draft 2 of the Study Scope for the 2024-2025 NorthernGrid Cycle FERC 1000 2024-25 Dec. 18, 2024, 7:06 a.m. NG_Study_Scope_2024_2025_Draft_V1.pdf (.pdf)
Nov 21 EVENT MPC November 2024 NorthernGrid Member Planning Committee FERC 1000 2024-25 Nov. 21, 2024, noon This meeting is conducted under standard business practices and procedures.
DOCUMENT MPC Comments on the Initial Draft Study Scope 2024-2025 FERC 1000 2024-25 Nov. 13, 2024, 2:06 p.m. Study_Scope_Round_1_Responses.pdf (.pdf)
DOCUMENT MPC NorthernGrid Study Scope Schedule Oct. 7, 2024, 1:46 p.m. Description of the steps and times needed for the successful creation of the NG Study Scope NG_2024_2025_Study_Scope_Timeline.pdf (.pdf)
Sep 18 EVENT MPC MPC Sept 2024 FERC 1000 2024-25 Sept. 18, 2024, 2 p.m. This meeting is conducted under standard business practices and procedures.
Sep 18 EVENT MPC MPC Sept 2024 FERC 1000 2024-25 Sept. 18, 2024, 2 p.m. This meeting is conducted under standard business practices and procedures.
Jul 24 EVENT MPC MPC July 2024 FERC 1000 2024-25 July 24, 2024, 1 p.m. This meeting is conducted under standard business practices and procedures.
Jun 26 EVENT MPC June 2024 MPC FERC 1000 2024-25 June 26, 2024, 1 p.m. This meeting is conducted under standard business practices and procedures.
DOCUMENT MPC NorthernGrid 2024 Econcomic Study Request FERC 1000 2024-25 May 23, 2024, 2:42 p.m. NorthernGrid_Economic_Study_Request_F… (.pdf) Additional ESR project information (.pdf) ESR Decision (.pdf)
DOCUMENT MPC Attachment K May 17, 2024, 7:51 a.m. Attachment K with numbering from NorthWestern Energy Att_K_-_Transmission_Planning_Process… (.pdf)
May 15 EVENT MPC May 2024 MPC FERC 1000 2024-25 May 15, 2024, 1 p.m. This meeting is conducted under standard business practices and procedures.
DOCUMENT MPC Economic Study Report: Pumped Storage Hydro on the Oregon Coast April 19, 2024, 5:11 a.m. Rye Development ESR Final Report ESR_OSW_PSH_Final.pdf (.pdf)
Apr 17 EVENT MPC April 2024 MPC FERC 1000 2024-25 April 17, 2024, 1 p.m. This meeting is conducted under standard business practices and procedures.
DOCUMENT MPC Draft ESR for Consideration, V3 April 11, 2024, 12:26 p.m. Rye Development ESR draft report, V3 ESR_OSW_PSH_V3.pdf (.pdf)