RTP Timeline updated June 25, 2021
Timeline for RTP development, updated June 25
2020-2021 RTP Timeline, Detailed
Describes the details and the milestones needed to effect the development of the Plan
2020-2021 RTP Timeline, High-Level
Describes the milestones needed to effect the development of the Plan
2021 Interregional Coordination Meeting Agenda
2021 NorthernGrid Interregional Coordination Meeting Presentation
The 2021 NorthernGrid Interregional Coordination presentation
States Workshop 2
EPSC Workshop 2 - System flows, power flow analysis, and transmission service - Presentation
States Workshop 1
Enrolled Parties and States Workshop 1 - Regional and Local Planning Presentation
TransCanyon Cross-Tie ITP Resource Modeling Proposal
Describes the Cross-Tie ITP resource output for the eight base cases
Target Path (Interface) Flows
A workbook that highlights the target path (interface) flows for power flow case tuning.
Regional Study PCM Simulation Hours Selection-Sample
Presentation of the Region Study ADS PCM Simulation Hours Selection - Sample Data
EPSC draft Study Scope Comments
Enrolled Parties and States Committee comments on the draft Study Scope
ADS v1.2.3 Hourly Results
A spreadsheet of the ADS v1.2.3 hourly results
July 29th Meeting Presentation
July 29th Meeting Presentation on the Draft Study Scope
EPSC Agendas
Present and Past EPSC Agendas
June 22, 2020 Cost Allocation Task Force Agenda
June 22, 2020 Cost Allocation Task Force Agenda
Enrolled Parties and States Committee Charter
Enrolled Parties and States Committee Charter
Transwest Express ITP Evaluation Plan
2020-21 Transwest Express Interregional Transmission Project Evaluation Plan
Cross-Tie ITP Evaluation Plan 2020-21
2020-21 Cross-Tie Interregional Transmission Project Evaluation Plan
NorthernGrid Introduction
NorthernGrid introduction slides created for the state and cost allocation representatives
Enrolled Parties Planning Committee Charter
Enrolled Parties Planning Committee Charter