RESOURCES





January 2026 MPC Minutes

January 2026 MPC Minutes

DOWNLOAD

Approved_Jan_2… (.docx)
Last updated March 18, 2026
2026 AICM Agenda; hosted by WestConnect
DOWNLOAD

3_26_26_aicm_m… (.pdf)
Last updated March 4, 2026
2026-2027 Data Submittal Form
DOWNLOAD

Data-Submittal… (.xlsx)
Last updated Feb. 26, 2026
2024-2025 Regional Transmission Plan

Final Transmission Plan for the 2024-2025 NorthernGrid Cycle

DOWNLOAD

2024-2025_Nort… (.pdf)
Last updated Nov. 19, 2025
2024-2025 Draft Final Regional Transmission Plan
DOWNLOAD

2024-2025_Draf… (.pdf)
Last updated Sept. 24, 2025
2024-2025 Draft RTP: Report Comments and Responses to initial posting
DOWNLOAD

2024-2025_Draf… (.pdf)
NG_MPC_Aug_202… (.pdf)
Last updated Aug. 20, 2025
Posted Draft RTP for 2024-2025 Cycle

The projects for the Draft RTP have been approved by the MPC

DOWNLOAD

2024-2025_Draf… (.pdf)
Last updated July 16, 2025
2025: Proposed schedule for Regional Transmission Plan
DOWNLOAD

2025_Updated_S… (.pptx)
Last updated Aug. 20, 2025
Remaining 2025 Regional Activities

A high-level, non-comprehensive list of some of the major regional activities over the rest of '25

DOWNLOAD

Interregional_… (.pdf)
Last updated May 28, 2025
2025 AICM NG Presentation
DOWNLOAD

AICM_NG_2025.p… (.pdf)
Last updated March 13, 2025
Annual Interregional Coordination Meeting 2025

High-level details for the 2025 AICM hosted by CAISO

DOWNLOAD

2025_Interregi… (.pdf)
Last updated Jan. 27, 2025
Approved 2024 Economic Study Request, North Plains Connector

Approved 2024 ESR Report for the North Plains Connector Project

DOWNLOAD

ESR_NorthPlain… (.pdf)
Last updated Jan. 23, 2025
Approved 2024-2025 Study Scope

Approved 2024-2025 Study Scope

DOWNLOAD

2024_2025_Appr… (.pdf)
Last updated Jan. 23, 2025
Draft ESR for Consideration, 2024 North Plains Connector
DOWNLOAD

ESR_NorthPlain… (.pdf)
Last updated Jan. 6, 2025
Comments on the Initial Draft Study Scope 2024-2025
DOWNLOAD

Study_Scope_Ro… (.pdf)
Last updated Nov. 13, 2024
Draft 2 of the Study Scope for the 2024-2025 NorthernGrid Cycle
DOWNLOAD

NG_Study_Scope… (.pdf)
Last updated Dec. 18, 2024
NorthernGrid Study Scope Schedule

Description of the steps and times needed for the successful creation of the NG Study Scope

DOWNLOAD

NG_2024_2025_S… (.pdf)
Last updated Oct. 7, 2024
Attachment K

Attachment K with numbering from NorthWestern Energy

DOWNLOAD

Att_K_-_Transm… (.pdf)
Last updated May 17, 2024
Economic Study Report: Pumped Storage Hydro on the Oregon Coast

Rye Development ESR Final Report

DOWNLOAD

ESR_OSW_PSH_Fi… (.pdf)
Last updated April 19, 2024
Draft ESR for Consideration, V3

Rye Development ESR draft report, V3

DOWNLOAD

ESR_OSW_PSH_V3… (.pdf)
Last updated April 11, 2024

TITLE
WORKGROUP
YEAR
TAGS