2025 FERC 1920 State Engagement Meeting Times
Draft ESR for Consideration, 2024 North Plains Connector
FERC 1920 Engagement, December 2024 Presentation
Relevant State Entities for FERC 1920 Engagement
List of Relevant State Entities for FERC 1920 Engagement
December 2024 State Engagement Meeting Agenda
Agenda for the State Engagement Meeting
Comments on the Initial Draft Study Scope 2024-2025
Nov 1 State Engagement Presentation
Nov 1 State Engagement Agenda
The agenda for the kickoff meeting for the State Engagement Period with Relevant State Entities
Draft 2 of the Study Scope for the 2024-2025 NorthernGrid Cycle
NorthernGrid Study Scope Schedule
Description of the steps and times needed for the successful creation of the NG Study Scope
FERC 1920 Engagement
NorthernGrid is commencing the State Engagement Period for FERC 1920 implementation November 1
Attachment K
Attachment K with numbering from NorthWestern Energy
Economic Study Report: Pumped Storage Hydro on the Oregon Coast
Rye Development ESR Final Report
Draft ESR for Consideration, V3
Rye Development ESR draft report, V3
Qualified Developer Determination for 2024 2025 cycle: TransCanyon
NorthernGrid 2024 Econcomic Study Request
Western Transmission Projects
A non-binding, high-level map of western transmission projects, regional and interregional