Unapproved Draft RTP for 2024-2025 Cycle
This draft report has yet to be approved by the Member Planning Committee and is subject to change
2025: Proposed schedule for Regional Transmission Plan
Remaining 2025 Regional Activities
A high-level, non-comprehensive list of some of the major regional activities over the rest of '25
2025 AICM NG Presentation
Annual Interregional Coordination Meeting 2025
High-level details for the 2025 AICM hosted by CAISO
Approved 2024 Economic Study Request, North Plains Connector
Approved 2024 ESR Report for the North Plains Connector Project
Approved 2024-2025 Study Scope
Approved 2024-2025 Study Scope
Draft ESR for Consideration, 2024 North Plains Connector
Comments on the Initial Draft Study Scope 2024-2025
Draft 2 of the Study Scope for the 2024-2025 NorthernGrid Cycle
NorthernGrid Study Scope Schedule
Description of the steps and times needed for the successful creation of the NG Study Scope
Attachment K
Attachment K with numbering from NorthWestern Energy
Economic Study Report: Pumped Storage Hydro on the Oregon Coast
Rye Development ESR Final Report
Draft ESR for Consideration, V3
Rye Development ESR draft report, V3
Qualified Developer Determination for 2024 2025 cycle: TransCanyon
NorthernGrid 2024 Econcomic Study Request
Western Transmission Projects
A non-binding, high-level map of western transmission projects, regional and interregional
WECC presentation for the AICM
WECC presentation for the AICM
Draft ESR for Consideration, Version 2
Updated draft 2023 ESR report
«
1-20 / 94
»