Comments on the Initial Draft Study Scope 2024-2025
Nov 1 State Engagement Presentation
Nov 1 State Engagement Agenda
The agenda for the kickoff meeting for the State Engagement Period with Relevant State Entities
Draft 2 of the Study Scope for the 2024-2025 NorthernGrid Cycle
NorthernGrid Study Scope Schedule
Description of the steps and times needed for the successful creation of the NG Study Scope
FERC 1920 Engagement
NorthernGrid is commencing the State Engagement Period for FERC 1920 implementation November 1
Attachment K
Attachment K with numbering from NorthWestern Energy
Economic Study Report: Pumped Storage Hydro on the Oregon Coast
Rye Development ESR Final Report
Draft ESR for Consideration, V3
Rye Development ESR draft report, V3
Qualified Developer Determination for 2024 2025 cycle: TransCanyon
NorthernGrid 2024 Econcomic Study Request
Western Transmission Projects
A non-binding, high-level map of western transmission projects, regional and interregional
WECC presentation for the AICM
WECC presentation for the AICM
Draft ESR for Consideration, Version 2
Updated draft 2023 ESR report
AICM 2024 WestConnect Presentation
AICM 2024 CAISO Presentation
AICM 2024 NorthernGrid Presentation
Draft ESR for Consideration
First draft of the 2023 ESR