DOCUMENT MPC Attachment K May 17, 2024, 7:51 a.m. Attachment K with numbering from NorthWestern Energy Att_K_-_Transmission_Planning_Process… (.pdf)
DOCUMENT MPC Economic Study Report: Pumped Storage Hydro on the Oregon Coast April 19, 2024, 5:11 a.m. Rye Development ESR Final Report ESR_OSW_PSH_Final.pdf (.pdf)
DOCUMENT MPC Draft ESR for Consideration, V3 April 11, 2024, 12:26 p.m. Rye Development ESR draft report, V3 ESR_OSW_PSH_V3.pdf (.pdf)
DOCUMENT Qualified Developer Determination for 2024 2025 cycle: PowerBridge FERC 1000 2024-25 April 10, 2024, 10:14 a.m. Table_B_Project_Qualified_Developer_E… (.pdf)
DOCUMENT MPC Qualified Developer Determination for 2024 2025 cycle: TransCanyon FERC 1000 2024-25 April 10, 2024, 10:12 a.m. Table_B_Project_Qualified_Developer_E… (.pdf)
DOCUMENT MPC NorthernGrid 2024 Econcomic Study Request FERC 1000 2024-25 May 23, 2024, 2:42 p.m. NorthernGrid_Economic_Study_Request_F… (.pdf) Additional ESR project information (.pdf) ESR Decision (.pdf)
DOCUMENT MPC Western Transmission Projects March 27, 2024, 12:45 p.m. A non-binding, high-level map of western transmission projects, regional and interregional Western_Transmission_Projects_Map_202… (.pptx)
DOCUMENT MPC WECC presentation for the AICM March 26, 2024, 11:14 a.m. WECC-AICM-20240326_2_HYwrByN.pptx (.pptx)
DOCUMENT MPC WECC presentation for the AICM March 26, 2024, 11:13 a.m. WECC-AICM-20240326_2.pptx (.pptx)
DOCUMENT MPC Draft ESR for Consideration, Version 2 March 20, 2024, 10:05 a.m. Updated draft 2023 ESR report ESR_OSW_PSH_V2.pdf (.pdf)
DOCUMENT MC AICM 2024 WestConnect Presentation FERC 1000 2024-25 March 20, 2024, 9:38 a.m. 2024-03-26_WestConnect_AICM_Slides.pdf (.pdf)
DOCUMENT MC AICM 2024 CAISO Presentation FERC 1000 2024-25 March 20, 2024, 9:46 a.m. Presentation-CaliforniaISOAnnualInter… (.pdf)
DOCUMENT MC AICM 2024 NorthernGrid Presentation FERC 1000 2024-25 March 20, 2024, 9:34 a.m. NothernGrid_AICM_2024.pdf (.pdf)
DOCUMENT MPC Draft ESR for Consideration March 13, 2024, 2:52 p.m. First draft of the 2023 ESR ESR_OSW_PSH_V1.pdf (.pdf)
DOCUMENT MPC Annual Interregional Coordination Meeting Agenda 2024 FERC 1000 2024-25 March 26, 2024, 9:34 a.m. Agenda for the 2024 AICM Annual_Interregional_Coordination_Mee… (.pdf)
DOCUMENT MPC 2024-2025 Data Submittal Form FERC 1000 2024-25 Feb. 14, 2024, 1:38 p.m. Updated data submittal form for 2024-2025 Data-Submittal-Form_Northern_Grid_202… (.xlsx)
DOCUMENT MPC NorthernGrid Economic Study Request Form Feb. 14, 2024, 9:51 a.m. Economic Study Request Form Economic_Study_Request_Form.pdf (.pdf)
DOCUMENT MPC NorthernGrid Submittal Process for Non-Incumbent Transmission Developers Feb. 14, 2024, 9:30 a.m. Tables needed to submit projects for regional, interregional or cost allocation consideration NorthernGrid_Process_for_Submitting_a… (.pdf)
DOCUMENT MC 2023 2023 Planning Agreement Feb. 5, 2024, 5:16 p.m. 2022-23_NG_Planning_Agreement_signatu… (.pdf)
DOCUMENT MPC 2024 Economic Study Request Form FERC 1000 2024-25 Jan. 8, 2024, 7:42 a.m. Form needed to submit an Economic Study Request Economic_Study_Request_Form_2024-2025… (.pdf)
DOCUMENT MPC 2022 2023 Regional Transmission Plan FERC 1000 2022-23 Dec. 19, 2023, 10:59 a.m. Approved 2022-2023 NorthernGrid Regional Transmission Plan 2022-23_Regional_Transmission_Plan.pdf (.pdf)