Economic Study Report: Pumped Storage Hydro on the Oregon Coast
Rye Development ESR Final Report
Draft ESR for Consideration, V3
Rye Development ESR draft report, V3
Qualified Developer Determination for 2024 2025 cycle: TransCanyon
NorthernGrid 2024 Econcomic Study Request
Western Transmission Projects
A non-binding, high-level map of western transmission projects, regional and interregional
WECC presentation for the AICM
WECC presentation for the AICM
Draft ESR for Consideration, Version 2
Updated draft 2023 ESR report
Draft ESR for Consideration
First draft of the 2023 ESR
Annual Interregional Coordination Meeting Agenda 2024
Agenda for the 2024 AICM
2024-2025 Data Submittal Form
Updated data submittal form for 2024-2025
NorthernGrid Economic Study Request Form
Economic Study Request Form
NorthernGrid Submittal Process for Non-Incumbent Transmission Developers
Tables needed to submit projects for regional, interregional or cost allocation consideration
2024 Economic Study Request Form
Form needed to submit an Economic Study Request
2022 2023 Regional Transmission Plan
Approved 2022-2023 NorthernGrid Regional Transmission Plan
NG response to Draft Final RTP comments
Formal response to submitted Draft Final RTP comments for the 2022-2023 planning cycle
ITCS Public Comments, November 2023
The ITCS requested comments on the study plan; these comments reflect NG's unanimous position
Comments on 2023 Draft Final RTP from NIPPC
These comments were submitted before the close of the Draft Final RTP Comment window.
2022 2023 Draft Final Regional Transmission Plan
Draft Final RTP for Public Comment
2023 ESR Study Scope
Approved ESR Study Scope for 2023 ESR